HERE! SPOTLIGHT COMPANY

Denek Contracting stands as a cornerstone of quality and reliability in Michigan’s construction industry. With a proven track record built over decades, the company has become a trusted name in foundation systems, poured concrete walls, waterproofing, and structural concrete solutions. Their commitment to precision, safety, and craftsmanship has made them the go-to partner for builders, developers, and homeowners who demand excellence from the ground up. At Denek, every project begins with integrity — ensuring strong foundations, lasting performance, and complete client satisfaction.

Tel: (586) 781-9670

Website: https://denekcontracting.com/ 

Address: 451 E Wilson Ave.
Pontiac, MI 48341

I-696 highway under reconstruction with cones, machinery, bridge repairs and detour signage

MDOT Begins Westbound I-696 Reconstruction Phase

Detroit, Michigan, November 14, 2025

The Michigan Department of Transportation has completed the eastbound phase of the I-696 rebuild between M-10 and I-75 and is moving into the westbound reconstruction. Westbound traffic will be reduced to three lanes with several ramps remaining open and others closed; a signed detour uses I-75, M-8 and M-10. The multi-year Restore the Reuther project includes roadway rebuilding, drainage work and repairs to 60 bridges, including the Church Street Plaza bridge which will have a pedestrian walkway detour during repairs. Communities along the corridor should expect traffic impacts and follow posted detours and reduced speed limits for safety.

Detroit, Michigan – The Michigan Department of Transportation (MDOT) has announced the completion of the eastbound reconstruction phase of I-696 between M-10 and I-75, marking a significant milestone in the ongoing “Restore the Reuther” project. This development sets the stage for the upcoming westbound reconstruction phase, which is scheduled to commence on November 16, 2025, and is expected to continue through late 2026.

Upcoming Westbound Reconstruction Phase

Starting at 10 a.m. on Sunday, November 16, 2025, MDOT will initiate the westbound reconstruction of I-696 from I-75 to Lahser Road. During this phase, westbound I-696 will be reduced to three lanes, with specific entrance and exit ramps remaining open. The affected ramps include:

  • I-75
  • M-1 (Woodward Avenue)
  • Southfield Road
  • US-24 (Telegraph Road)/M-10 (Lodge Freeway)/Lahser Road

Conversely, the following westbound entrance and exit ramps will be closed throughout the reconstruction period:

  • Couzens Avenue
  • Bermuda/Hilton Road
  • Coolidge Highway
  • Greenfield Road
  • Evergreen Road

Detour Routes

Motorists traveling westbound on I-696 are advised to utilize the following detour route:

  • Exit at southbound I-75
  • Proceed westbound on M-8 (Davison Freeway)
  • Continue northbound on M-10 (Lodge Freeway) to rejoin westbound I-696

Project Overview

The “Restore the Reuther” project is a comprehensive initiative aimed at rebuilding I-696 to enhance safety and traffic flow. The project encompasses the reconstruction of the roadway, bridge work, and drainage structures. Notably, 60 bridges are being repaired, including the Church Street Plaza bridge that contains Victoria Park. During the rebuilding of this bridge, a walkway detour will be in place to ensure pedestrian safety. The westbound reconstruction phase is expected to be completed by late 2026, with further major road work planned for 2027 between I-75 and Dequindre Road. This work includes additional rebuilding of the roadway, bridge improvements, and drainage structures.

Impact on Local Communities

The reconstruction efforts will affect several communities along the I-696 corridor, including Ferndale, Hazel Park, Huntington Woods, Lathrup Village, Madison Heights, Oak Park, Pleasant Ridge, Royal Oak, Southfield, and Warren. Residents and commuters are encouraged to plan their routes accordingly and stay informed about project developments through official MDOT communications.

Safety Measures and Recommendations

MDOT emphasizes the importance of adhering to posted detour signs and speed limits within construction zones to ensure the safety of both workers and drivers. Travelers are advised to allow extra time for their commutes and to stay updated on project progress through MDOT’s official channels.

Conclusion

The completion of the eastbound reconstruction phase and the upcoming westbound reconstruction signify substantial progress in the “Restore the Reuther” project. These efforts are part of MDOT’s ongoing commitment to improving Michigan’s transportation infrastructure, aiming to provide safer and more efficient travel for all road users.

FAQs

What is the “Restore the Reuther” project?
The “Restore the Reuther” project is a comprehensive initiative by the Michigan Department of Transportation (MDOT) aimed at rebuilding I-696 to enhance safety and traffic flow. The project includes reconstructing the roadway, bridge work, and drainage structures, with 60 bridges being repaired, including the Church Street Plaza bridge that contains Victoria Park. During the rebuilding of this bridge, a walkway detour will be in place to ensure pedestrian safety. The westbound reconstruction phase is expected to be completed by late 2026, with further major road work planned for 2027 between I-75 and Dequindre Road. This work includes additional rebuilding of the roadway, bridge improvements, and drainage structures.
When does the westbound reconstruction phase of I-696 begin?
The westbound reconstruction phase of I-696 is scheduled to commence on November 16, 2025, at 10 a.m., and is expected to continue through late 2026.
Which westbound I-696 ramps will remain open during the reconstruction?
During the westbound reconstruction phase, the following ramps will remain open:

  • I-75
  • M-1 (Woodward Avenue)
  • Southfield Road
  • US-24 (Telegraph Road)/M-10 (Lodge Freeway)/Lahser Road
Which westbound I-696 ramps will be closed during the reconstruction?
The following westbound entrance and exit ramps will be closed throughout the reconstruction period:

  • Couzens Avenue
  • Bermuda/Hilton Road
  • Coolidge Highway
  • Greenfield Road
  • Evergreen Road
What is the recommended detour route for westbound I-696 traffic?
Motorists traveling westbound on I-696 are advised to utilize the following detour route:

  • Exit at southbound I-75
  • Proceed westbound on M-8 (Davison Freeway)
  • Continue northbound on M-10 (Lodge Freeway) to rejoin westbound I-696
Which communities are affected by the I-696 reconstruction project?
The reconstruction efforts will affect several communities along the I-696 corridor, including Ferndale, Hazel Park, Huntington Woods, Lathrup Village, Madison Heights, Oak Park, Pleasant Ridge, Royal Oak, Southfield, and Warren. Residents and commuters are encouraged to plan their routes accordingly and stay informed about project developments through official MDOT communications.

Key Features of the I-696 Reconstruction Project

Feature Description
Project Name Restore the Reuther
Eastbound Completion Completed
Westbound Start Date November 16, 2025
Expected Westbound Completion Late 2026
Bridges Under Repair 60 bridges, including Church Street Plaza bridge
Communities Affected Ferndale, Hazel Park, Huntington Woods, Lathrup Village, Madison Heights, Oak Park, Pleasant Ridge, Royal Oak, Southfield, Warren

Deeper Dive: News & Info About This Topic

HERE Resources

Major Road Construction Impacts Macomb and Metro Detroit Commuters

STAFF HERE DETROITMI WRITER
Author: STAFF HERE DETROITMI WRITER

DETROIT STAFF WRITER The DETROIT STAFF WRITER represents the experienced team at HEREDetroitMI.com, your go-to source for actionable local news and information in Detroit, Wayne County, and beyond. Specializing in "news you can use," we cover essential topics like product reviews for personal and business needs, local business directories, politics, real estate trends, neighborhood insights, and state news affecting the area—with deep expertise drawn from years of dedicated reporting and strong community input, including local press releases and business updates. We deliver top reporting on high-value events such as Movement Electronic Music Festival, Detroit Grand Prix, and America's Thanksgiving Parade. Our coverage extends to key organizations like the Detroit Regional Chamber and Focus HOPE, plus leading businesses in automotive and healthcare that power the local economy such as General Motors, Ford Motor Company, and Henry Ford Health. As part of the broader HERE network, including HEREGrandRapids.com, HERENorthville.com, HERENovi.com, and HEREPlymouth.com, we provide comprehensive, credible insights into Michigan's dynamic landscape.

FOLLOW HERE! ON

GO!

This story is part of our Local Spotlight series, supported by Denek Contracting . All reporting reflects HERE Detroit independent editorial standards. About Our Process.

WordPress Ads